Project Description

The Daniel Hoan Memorial Bridge is a tied arch bridge that connects IH 794 to the Lake Freeway in downtown Milwaukee. Spanning across the Milwaukee River, this section of interstate is a crucial means of transportation between South Milwaukee and downtown. Lakeside Engineers is currently providing support staff for this urban reconstruction project by improving safety while reducing congestion and modernizing the IH 794 Hoan Bridge, including:

  • Complete removal and replacement of decking
  • Steel repairs
  • Revitalizing retaining walls, storm sewers while providing new signing and markings

Capitol Drive Milwaukee County

STH 190
Estabrook Parkway to Lake Drive
Milwaukee County

Project Description

STH 190, or Capitol Drive, is an important means of transportation that runs through Shorewood, connecting IH 43 to the Lakefront. The 1.2 mile stretch of roadway was in need of repair and many environmental and pedestrian improvements were made during the project. Lakeside Engineers was able to provide support staff for this urban reconstruction project by improving safety while revitalizing the community in performing the following tasks:

  • Constructing the Oak Leave Trail pedestrian bridge
  • Intersection improvements
  • Bump outs to advance pedestrian safety
  • Biofiltration devices that use plants to filter rain water before entering the storm sewer

Becher Street ramp Milwaukee County

Becher Street IH 43/94 North Bound On Ramp
IH 43/94
Milwaukee County

Project Description

This project entailed the Becher Street entrance ramp underwent and emergency repair following a full ramp closure in 2012. This location is a crucial ramp to merge onto IH 43/94 and needed to be reinstated with the utmost urgency due to a deteriorated beam. With only 21 days of construction, Lakeside Engineers was able to provide support staff for this project by improving safety for drivers through preforming the following tasks:

  • Demolition
  • Earthwork
  • Grading
  • Base Aggregate
  • HMA Pavement
  • Concrete Barrier
  • Steel Plate Beam Guard
  • Pavement Marking
  • Drainage
  • Storm Sewer

WIS 165 Kenosha County

104th Street
County ML and County EZ Intersections
Pleasant Prairie
Kenosha County

Project Description

STH 165, also known as 104th Street, is an important means of connectivity to the Village of Pleasant Prairie. This project was primarily focused on revitalizing the intersections of County ML and County EZ. These intersections have been improved to become 2 lane roundabouts with clear signing and sidewalks. Lakeside Engineers provided support staff for this project by improving safety and also modernized STH 165. Some of these improvements consist of:

  • Grading
  • Storm Sewer
  • Dense Graded Base
  • Concrete Curb, Gutter, and Concrete Pavement
  • Storm Water Pond
  • Street Lighting
  • Erosion Control
  • Pavement Marking

WIS 164 Washington County

County Q to WIS 60
WIS 164
Rehabilitation
Washington County

Project Description

Wisconsin Highway 164 is a two lane rural arterial north-south commercial trucking route. This project, which is located primarily in the Village of Richfield, will address the poor pavement condition, safety, and traffic flow within the project corridor that serves local commuter, farming, and commercial traffic between Waukesha and Hartford. This project involves safety improvements and the rehabilitation of WIS 164 from County Q to WIS 60. Although this project does not involve roadway expansion, extensive public involvement is required due to past roadway projects along the corridor. The following improvements are proposed to address key deficiencies and to improve safety along the corridor:

  • Intersection operational improvements at the Hubertus Road and WIS 164 intersection.
  • Intersection operational improvements at the WIS 167 and WIS 164 intersection.
  • The roadway will be resurfaced from County Q to Cherokee Trail and from Grey Stone Drive to 2,800-feet north of Club Drive.
  • Sight distances will be improved from Cherokee Trail to Grey Stone Drive by reconstruction of the existing roadway to correct vertical alignment deficiencies.

General Tasks

  • Development of a detour plan and a Type 2 TMP.
  • Development of a crash analysis.
  • Development of traffic control and staging plans.
  • Assistance with public outreach.

IH 43 Walworth County

Rock County Line to USH 12
IH 43 Rock Freeway
Rehabilitation
Walworth County

Project Description

I-43, Rock Freeway, is a four lane interstate connecting south-central Wisconsin to southeastern Wisconsin, specifically the Milwaukee Metropolitan area. This project spans from the Village of Darien in the south to the City of Elkhorn in the north. It will rehabilitate IH-43 from the Rock County Line to USH 12 in Walworth County. Lakeside is leading the design of a 6.3 mile rehabilitation from the Rock County Line to County X. The following improvements are proposed to address key deficiencies and to improve safety along the corridor:

  • Diamond grinding
  • Rubblizing.
  • Overlay.
  • Reconstruction of the shoulders.

General Tasks

  • Development of a detour plan and a Type 3 TMP.
  • Development of a crash analysis.
  • Storm water analysis.
  • Development of plan and profile sheets, cross sections, pavement marking plan, traffic control plans, and construction detail plan.
  • Assistance with public outreach.

WIS 11 Racine County

County C to 71st Street
WIS 11
Reconstruction
Racine County

Project Description

Wisconsin Highway 11 is a two-lane roadway with both urban and rural segments passing through the Village of Union Grove. This project includes the rehabilitation and reconstruction of a two-lane highway with both urban and rural sections. The following improvements are proposed to address key deficiencies and to improve safety along the corridor:

  • The current WIS 11 pavement will be pulverized and repaved from County C to Schoen Rd.
  • The remainder of the roadway will be reconstructed from Schoen Rd to 71st.
  • For the rural sections, shoulders will be increased to a 10-foot width, 5-feet of which will be paved to accommodate bicycles, and the size of the ditches will be increased to improve drainage.
  • For the urban sections, curb and gutter will be included on both sides of the highway.
  • The intersection of WIS 11 and US 45 will be reconstructed to increase capacity, and to improve safety, left-turn lanes will be added from WIS 11 to USH 45.

General Tasks

  • Development of a detour plan and a TMP.
  • Development of traffic control and staging plans.
  • Assistance with public outreach.
  • Assistance with general project QA/QC.

IH 43 TCP Milwaukee & Ozaukee Counties

Silver Spring Drive to WIS 60
IH 43 TPC
Milwaukee and Ozaukee Counties

Project Description

The I-43 North-South Freeway is among the busiest routes in Wisconsin and is a critical Interstate link between southeast Wisconsin and the entire state. I-43 provides access to manufacturers, merchants, commuters and tourists within southeast Wisconsin, the Milwaukee metropolitan area, and other areas including Green Bay, Sheboygan, Manitowoc and Chicago.

WisDOT has maintained and rehabilitated the ramps, bridges, pavements and other structures on I-43 for 50 years. The North-South Freeway has exceeded its design life and it is no longer economical to maintain. The corridor needs full evaluation, so it can serve the communities into the future.

The project team will study the corridor, including the service interchanges and adjacent arterial roads in Milwaukee and Ozaukee counties. This review will:

  • Identify safety concerns.
  • Assess physical condition and configuration of the roadways.
  • Identify potential environmental concerns and socioeconomic factors that may be affected by the corridor.

General Tasks

  • Assistance with roadway design

WIS 57 Milwaukee County

Teutonia Avenue to Mequon Road
WIS 57
Reconstruction
Milwaukee & Ozaukee Counties

 

Project Description

Wisconsin Highway 57 is a four lane divided principal arterial that runs north-south in Ozaukee and Milwaukee Counties, through the City of Mequon, Village of Brown Deer, and Village of River Hills. WIS 57 has experienced distressed pavement and is in need of resurfacing. The following improvements are proposed to address key deficiencies and to improve safety along the corridor:

  • WIS 57 will be resurfaced
  • WIS 57/WIS 100 interchange will be reconstructed to accommodate growing traffic volumes and to provide adequate structural clearance.

General Tasks

  • Development of a detour plan and a Type 3 TMP.
  • Development of a crash analysis.
  • Development of traffic control and staging plans.

IH 43 Ozaukee County

WIS 60 to North Ozaukee County Line
IH 43
Bridge Rehabilitation

Ozaukee County

Project Description

I-43 is a four lane interstate connecting the northeast region of Wisconsin to its southeast region. This project spans from the Town of Grafton at the southern limits to the Village of Belgium at the northern limits. It will rehabilitate 10 of the existing bridges located along the IH 43 corridor, from STH 60 extending north to the Ozaukee County line. This project works over I-43 on the bridges at Arrowhead Rd, CTH V, STH 32, Ulao Pkwy, Sauk Rd, CTH P, Sandy Beach Rd, Cedar Beach Rd, CTH D and Silver Beach Rd. Lakeside is leading the design. The following improvements are proposed to address key deficiencies and to improve safety along the corridor:

  • Concrete, Epoxy, or Polymer Asphalt Overlay.
  • Deck Replacement.
  • Bridge Painting.
  • Approach Overlay.
  • Re-Seal Slopes.
  • Bearing Replacement.
  • Beam Guard improvements.

General Tasks

  • Development of a detour plan and a Type 2 TMP.
  • Development of a crash analysis.
  • Development of an environmental report.
  • Public Outreach
  • Development of plan and profile sheets, cross sections, pavement marking plan, storm sewer plan, FTMS plans, traffic control plans, and construction detail plan.