Category Archives: Construction Management

Capitol Drive Milwaukee County

STH 190
Estabrook Parkway to Lake Drive
Milwaukee County

Project Description

STH 190, or Capitol Drive, is an important means of transportation that runs through Shorewood, connecting IH 43 to the Lakefront. The 1.2 mile stretch of roadway was in need of repair and many environmental and pedestrian improvements were made during the project. Lakeside Engineers was able to provide support staff for this urban reconstruction project by improving safety while revitalizing the community in performing the following tasks:

  • Constructing the Oak Leave Trail pedestrian bridge
  • Intersection improvements
  • Bump outs to advance pedestrian safety
  • Biofiltration devices that use plants to filter rain water before entering the storm sewer

Becher Street ramp Milwaukee County

Becher Street IH 43/94 North Bound On Ramp
IH 43/94
Milwaukee County

Project Description

This project entailed the Becher Street entrance ramp underwent and emergency repair following a full ramp closure in 2012. This location is a crucial ramp to merge onto IH 43/94 and needed to be reinstated with the utmost urgency due to a deteriorated beam. With only 21 days of construction, Lakeside Engineers was able to provide support staff for this project by improving safety for drivers through preforming the following tasks:

  • Demolition
  • Earthwork
  • Grading
  • Base Aggregate
  • HMA Pavement
  • Concrete Barrier
  • Steel Plate Beam Guard
  • Pavement Marking
  • Drainage
  • Storm Sewer

WIS 165 Kenosha County

104th Street
County ML and County EZ Intersections
Pleasant Prairie
Kenosha County

Project Description

STH 165, also known as 104th Street, is an important means of connectivity to the Village of Pleasant Prairie. This project was primarily focused on revitalizing the intersections of County ML and County EZ. These intersections have been improved to become 2 lane roundabouts with clear signing and sidewalks. Lakeside Engineers provided support staff for this project by improving safety and also modernized STH 165. Some of these improvements consist of:

  • Grading
  • Storm Sewer
  • Dense Graded Base
  • Concrete Curb, Gutter, and Concrete Pavement
  • Storm Water Pond
  • Street Lighting
  • Erosion Control
  • Pavement Marking