262-789-8200

  • About
  • Meet the Team
  • Services
    • WHAT WE DO
    • Construction Management
    • Transportation Design
    • Traffic Engineering
    • TSMO
  • Careers
    • WORK WITH US
    • Construction Technician
  • Contact
  • More
    • About
    • Meet the Team
    • Services
      • WHAT WE DO
      • Construction Management
      • Transportation Design
      • Traffic Engineering
      • TSMO
    • Careers
      • WORK WITH US
      • Construction Technician
    • Contact
  • About
  • Meet the Team
  • Services
    • WHAT WE DO
    • Construction Management
    • Transportation Design
    • Traffic Engineering
    • TSMO
  • Careers
    • WORK WITH US
    • Construction Technician
  • Contact

County KR Phase 2, County H to WIS 31

Lakeside managed the reconstruction and urbanization of 2.9 miles of County KR into a 4-lane divided roadway with multi-use path for the Wisconsin DOT. The project involved four new bridges and retaining walls to carry County KR over Union Pacific and Canadian Pacific railroads. Two additional bridges were built to replace a box culvert crossing the Pike River. Signalized intersections were also constructed at locations including Old Green Bay Road and WIS 31.

Items of Work

  • Traffic signals
  • Lighting
  • Detention ponds
  • Concrete pavement
  • HMA pavement
  • Storm sewer
  • Curb and gutter
  • Retaining walls
  • Sanitary sewer

Project Details

Client

Wisconsin Department of Transportation


Project Cost

$44M


Project Dates

July 2018 - August 2022


ENGINEERING SOLUTIONS DRIVEN BY TRUST, EXPERIENCE, AND EXPERTISE

Connect with us

909 N. Mayfair Road, Suite 100, Wauwatosa, WI 53226

262-789-8200


Copyright © 2018 Lakeside Engineers - All Rights Reserved.


Powered by