Lakeside recently delivered the PS&E for the design of 6.95 miles of I-94 from WIS 83 to WIS 16 in Waukesha County, Wisconsin. Improvements include milling the existing HMA pavement, base patch, joint and crack repair, and placing HMA pavement from WIS 83 to County T. Spot concrete pavement repair will be performed from County T to WIS 16. The ancillary roadway infrastructure from WIS 83 to WIS 16, including roadside barrier, traffic signals, culverts, bridges, and a retaining wall, will also be improved due to expected life span and inspection report findings.
Project Details
Client
Wisconsin Department of Transportation
Project Dates
June 2021 - February 2024
Items of Work
Environmental documentation
Traffic signal analysis
Traffic signal design
Roadside barrier evaluation
Utility coordination
Stakeholder coordination
Public involvement
Traffic staging
TMP
ADA curb ramp upgrades
Park and ride lot improvements
ENGINEERING SOLUTIONS DRIVEN BY TRUST, EXPERIENCE, AND EXPERTISE