262-789-8200

  • About
  • Meet the Team
  • Services
    • WHAT WE DO
    • Construction Management
    • Transportation Design
    • Traffic Engineering
    • TSMO
  • Careers
    • WORK WITH US
    • Construction Technician
  • Contact
  • More
    • About
    • Meet the Team
    • Services
      • WHAT WE DO
      • Construction Management
      • Transportation Design
      • Traffic Engineering
      • TSMO
    • Careers
      • WORK WITH US
      • Construction Technician
    • Contact
  • About
  • Meet the Team
  • Services
    • WHAT WE DO
    • Construction Management
    • Transportation Design
    • Traffic Engineering
    • TSMO
  • Careers
    • WORK WITH US
    • Construction Technician
  • Contact

I-43 Rock Freeway, Rock County Line to US 12

Lakeside managed the 15.85 miles of interstate freeway rehabilitation of I-43 in Walworth County. The structural rehabilitation portion of this Wisconsin DOT project covered 32 bridges with improvements including bridge re-decks, concrete deck overlays, thin polymer overlays, and abutment expansion joint replacement.

Items of Work

  • Shoulder reconstruction
  • Base patching
  • Concrete pavement
  • Erosion control
  • Beam guard replacement
  • Signing
  • Concrete pavement diamond grinding
  • Traffic control 
  • Pavement marking

Project Details

Client

Wisconsin Department of Transportation


Project Cost

$25.5M


Project Dates

March 2020 - November 2021


ENGINEERING SOLUTIONS DRIVEN BY TRUST, EXPERIENCE, AND EXPERTISE

Connect with us

909 N. Mayfair Road, Suite 100, Wauwatosa, WI 53226

262-789-8200


Copyright © 2018 Lakeside Engineers - All Rights Reserved.


Powered by