262-789-8200

  • About
  • Meet the Team
  • Services
    • WHAT WE DO
    • Construction Management
    • Transportation Design
    • Traffic Engineering
    • TSMO
  • Careers
    • WORK WITH US
    • Construction Technician
  • Contact
  • More
    • About
    • Meet the Team
    • Services
      • WHAT WE DO
      • Construction Management
      • Transportation Design
      • Traffic Engineering
      • TSMO
    • Careers
      • WORK WITH US
      • Construction Technician
    • Contact
  • About
  • Meet the Team
  • Services
    • WHAT WE DO
    • Construction Management
    • Transportation Design
    • Traffic Engineering
    • TSMO
  • Careers
    • WORK WITH US
    • Construction Technician
  • Contact

Teutonia Avenue Intersection

Lakeside was selected to lead this design project at WIS 57 and Teutonia Avenue in the Village of Brown Deer, Wisconsin. The project replaced a three-legged intersection with a roundabout. Extensive Section 4(f) coordination was conducted with Milwaukee County Parks for the shared use path roadway crossing modifications to the Oak Leaf Trail. The modified crossing enhanced bike/pedestrian access.

Project Details

Client

Wisconsin  Department of Transportation


Project Dates

January 2018 - May 2021



Items of Work

  • Environmental documentation
  • TMP
  • Intersection Control Evaluation
  • Bike/ped accommodations
  • Public involvement
  • Utility coordination
  • Stakeholder coordination
  • Section 4(f) (Oak Leaf Trail) coordination


ENGINEERING SOLUTIONS DRIVEN BY TRUST, EXPERIENCE, AND EXPERTISE

Connect with us

909 N. Mayfair Road, Suite 100, Wauwatosa, WI 53226

262-789-8200


Copyright © 2018 Lakeside Engineers - All Rights Reserved.


Powered by